Start with a plan that already knows the job.
Free project plans for automation, equipment and aerospace work. Every task is linked, so change one date and the rest follows. Download for Microsoft Project or Excel, or open it in Takt.
Automation and equipment
Machines built to order, cells, panels and the weeks on a customer’s site.
Build-to-order machine
Engineering, purchased parts, fabrication, assembly, FAT, ship and install for one custom machine.
Robotic cell integration
Concept to production for a robot cell: simulation, guarding, end-of-arm tooling, risk assessment and run-off.
Control panel build
Schematics, bill of material, enclosure layout, wiring, point-to-point checkout and power-up for one panel.
PLC and HMI upgrade
Replace an obsolete controller on a running line: code conversion, bench test, cutover weekend and support.
Conveyor line install
Site readiness, mechanical install, electrical, I/O checkout, commissioning and site acceptance.
Capital equipment purchase
The buyer’s side: requirements, quotes, purchase order, design approvals, FAT, delivery and qualification.
Aerospace
Design reviews, long-lead parts, test campaigns and first articles.
Test rig program
Requirements through PDR and CDR, long-lead parts, build, instrumentation and commissioning of a test rig.
Qualification test campaign
Test plan, fixtures, test readiness review, vibration, thermal and endurance tests, report and sign-off.
First article inspection
A new part into production with a first article inspection report: planning, tooling, first run, inspection, approval.
Tooling and fixture build
Design, review, machining, assembly, inspection and buy-off for an assembly jig or test fixture.
Supplier source transfer
Move a part to a new supplier: audit, data package, first articles, qualification lot and ramp to rate.
Ground support equipment
Design, stress check, fabrication, proof load test and delivery of a stand, sling or handling fixture.
Rather not start from a file?
Takt is a Gantt scheduler that runs in your browser. One project stays free, any size, with no card.