Changelog

What changed in Takt.

What's new in Takt, newest first. Each day's highlights are added at the end of the day.

  • Commitments strip. Every promise sits in one strip across the top of the Gantt, so you see them all at a glance.
  • Late work pushes what follows. A late item's bar runs to today, and the work linked after it moves out to match.
  • The Materials window is back. Every material in one window, with late rows plainly marked.
  • Design packages. Track dated design deliverables in a window of their own.
  • Teammates start with Actions. People you invite have Takt Actions switched on from day one.
  • A steadier iPhone. A solid tab bar and the Actions look carried onto the phone.

Another big one. Here is everything you'll notice since Nov 19.

Takt Actions

  • Actions is a to-do list. One add line on every screen, Mine shows what's yours, and a tap marks it done or waiting.
  • A new Mine screen. Late work sits on top, and Done folds away until you want it.
  • Drag it anywhere. Move an action to any task in one drag, and it stays where you put it.
  • Blocked by someone. Say who you're waiting on, and they see it under Waiting on you.
  • A calmer Alert center. One card at a time, with one-tap answers. You never get an alert about your own change.

Late work and progress

  • Late work shows itself. A late start shows amber and a late finish red, and dates lock on the day work starts.
  • Progress fills itself in. A task's % follows its dates on its own, and you can still set it by hand.
  • Lag you can see. A link line turns orange over its lag days.
  • Bars fill as work gets done. Each bar fills with its own colour as work is done, stays amber until it starts, and turns plain grey once finished.

Materials

  • Shipping time. Add days in transit after the lead time, and the order-by day and arrival include them.
  • Material dates drive late. A material's promise date decides when it's late, and Procurement's status sets itself.
  • In the bottom inspector. Materials open in the same inspector as every Gantt row.
  • One Undo. A material change and the dates it moved undo together in one step.

Everywhere

  • Vera is now Vera. Our planning assistant has a new name. It's still invite-only for now; see Coming soon.
  • Saves that stick. Changes save every time, even after going Back in Safari.
  • Back to the Gantt as you left it. Coming back from Actions keeps your row and the inspector just as they were.
  • Exports match the Gantt. Blocked and late work print the way they look on screen.
  • Invite who you added. Invite someone you added by hand, with their job and access, and bring back someone you removed.
  • Start over, your way. Settings can restart the welcome, bring back the tips and restore the demo projects.
  • Fresh project colours. Nine new project colours that never get mixed up with late red or moved amber.
  • Polished iPhone screens. Cleaner titles and tidier screens throughout Takt on iPhone.

Our biggest update yet. Here is everything you'll notice since Nov 17.

Sign-up

  • Start free with just your email. One click on Start free and a cleaner sign-up page.

Late work

  • Promises sit on the work they promise. A flag marks each promise on its task. It turns green only when the promise is kept, and red once the date passes.
  • Protect a promise with spare days. Give a promise or milestone spare days, and see how many are left, or how many days late it is once it slips.
  • Moved later, plainly marked. A red dash runs from where the work first should have finished to where it finishes now. A bar that got longer gets a red hatch.
  • Why did it move? Move a task later by hand and Takt asks why, then keeps the reason with the move.
  • Planned means the dates are real. Tick Planned when a task's dates are firm. From then on, every move later counts.
  • A nudge for loose ends. An alert tells you when work that starts soon isn't Planned yet.
  • Late reads late everywhere. A promise or task moved past its first finish shows as late on every screen.
  • Late marks on or off. One tick in the View menu shows or hides the late marks.
  • Work in progress keeps moving. A task that has started but has no % yet follows the days, striped.

Materials

  • Materials live in Procurement. Add key materials under Procurement at any level, and a thin line ties each one to the task it feeds.
  • Procurement grows to fit. A Procurement task spans its materials from order day to arrival.
  • Push a material, the plan follows. Push a late material out and the work after it moves with it.
  • Late-material alerts. Takt tells you when a material will arrive late and lets you push it out from the alert.
  • Materials never go missing. Choose which task a material shows under, and it stays there.

Gantt

  • A View menu. Links, Critical path, Actions, Done actions, Baseline and Timeline, all in one place.
  • One-row command bar. On wider screens the command bar fits on one row, with a jump to Actions and back.
  • Done bars end on the real finish. A finished task's bar stops on the day it really finished, and the Inspector says how that date was set.
  • Tidier action dots. Actions on the Gantt draw as clean dots, with a ring on the one you pick.
  • Turn into actions, faster. Turn more rows into actions at once, and add a package straight onto a phase.
  • A clearer Timeline. Taller section bars keep names clear of milestone diamonds.

Takt Actions

  • A roomier inspector. Actions open in a bigger inspector that fits iPad, with full-width Steps and Notes.
  • Works like the Gantt. The right-click menu, the View menu and the status strip match the Gantt's, Highlight and Add to timeline included.
  • One project picker. The same picker on the Gantt and in Actions, and All projects opens the overview again.
  • Lists one click away. Your saved lists sit on the Actions command bar.
  • Calmer rows. Columns line up, milestones indent with their rows, and Why it matters fits on one line.
  • One rule for late. An action turns red when it is past its due day or past its task.
  • Moves keep their history. An action remembers each move later, and the chart shows a small count of how far it moved.
  • Smoother on iPad. Trackpad swipes and scrolling inside a window no longer move the whole screen.
  • Fixed: dragging an action back inside its task no longer closes the Actions screen, and marking an action Done from its status circle saves again.

Everywhere

  • A proper start. Takt opens on a splash screen that lifts as soon as your first screen is ready.
  • One look for buttons. Every button, close button and selection highlight follows one style.
  • A tidier command bar. The assistant and Board now sit under More.
  • Tab through every form. The Tab key reaches every box in every window and form.

  • Actions on your Gantt. Your actions show as marks right on the Gantt, and you can drag one to a new date.
  • Lists in Actions. Save actions as a list, see what each one waits on, and spot what is ready to go.
  • Why it matters, at a glance. Each action's reason now shows right in the Actions list.
  • Five apps on Home. Home opens with five app tiles, Dashboard included, one click from your projects.
  • Buffers you can read. A used-up buffer shows plainly on the Gantt, so you know how much room is left.
  • How late, on the chart. Late work shows how late it is right on the Gantt.

  • Takt Actions is here. A planner for your team's actions, with its own chart, an Inbox and a By date view, and it works just like the Gantt.
  • Resources for everyone. See who is on what in one large window from the command bar, with time off in each person's card.
  • Roles for your team. Mark teammates as PM, Engineer or Manager, and each one lands where their work is.
  • Your apps, one click from Home. A new row above your projects opens Actions, Notes, Resources, Dashboard and Team.
  • Bars follow real dates. Record when a task actually started and finished, and its bar follows.
  • Timeline zoom that stays readable. Names, dates and marks keep their size while you zoom the Timeline.

  • Smooth motion everywhere. Windows and menus glide in, saved changes glow, and counts roll into place.
  • A calmer Home. Home drops the grid for a clean, cool background, with a clear New project box up front.
  • Timeline in one clean line. The Timeline strip draws as one straight line, and overlapping phases chain end to end.
  • Faster Export on big plans. Export opens again in a snap, even on large plans.
  • Snappier links. Links and slack keep up as you edit, with less waiting on busy plans.
  • Clearer screens. We trimmed extra helper sentences, so each screen says only what matters.

  • Four sample projects to explore. New accounts start with four ready-made projects, each with a short intro.
  • A warmer first sign-in. Watch the demo or explore on your own, with Help one click away.
  • Every project tells its story. Right-click a project on Home to see its story and a description you write.
  • Project brief. Keep the brief for each project right in the Plan window.
  • Late work, clearly red. Late work turns red on the Gantt, and a commitment card leads with how late it is.
  • Progress keeps the bar. Mark progress and the bar stays exactly where you put it.
  • One-line Timeline export. The Timeline export page lays out in one clean, straight line.

  • Calmer Export. Export opens on your Gantt, with status badges, a share link and a key-dates strip.
  • What's new, in the app. After each update, a short card tells you what changed.
  • Plan History, refreshed. A cleaner layout, with Export history one click away at the top.
  • Edit from the Bars window. Click a bar, word, mark or link in the sample to change it right beside it.
  • A handier right-click menu. Open the Inspector, reach the Timeline strip and pick colours, all from one task menu.
  • Friendlier emails. A lighter look for every email, and a personal welcome the morning after you sign up.
  • Fresh help pages. Getting started, right-click menus, moving bars and export, rewritten in plain words.

  • Easier links. Drop a link anywhere on the other task, or make one with two clicks.
  • A bar on any row. Place a bar on any row that has none, without selecting the row first.
  • Easier to grab. Bigger press areas for grab bars and link bubbles, with nothing on screen getting bigger.
  • Cleaner dragging. A bar you drag stays crisp, and its start outline waits until the bar is clear.

  • Sign up in seconds. Pick a password right on the form, or Continue with Google. No email link to wait for.
  • One project, free for life. Any size, no card. No limits at all for your first 90 days, and Pro is $7 a month when you need more.
  • Board view. See any project as cards on a board, grouped by stage, with your labels as tags.
  • Free plan templates. Twelve ready-made plans on our website that open straight in Takt.
  • A message line you can trust. It sits at the top of every screen, stays until the next message, and says which task moved and to when.
  • Teal glow and gridlines. The selected bar gets a teal ring and glow, and gridlines come in None, Standard or Teal.
  • Plan history as a PDF. Export a plan's history and send it, ready to read.
  • Inspector cards that stay put. Frosted cards rise from a grab bar or a click, and Buffer, links and notes open in a pop-up beside the card.

  • Bring your demo plan. Build a plan in the live demo, sign up, and it comes with you.
  • A warm welcome. New accounts open with a Get started list and a short setup checklist.
  • Hands-on practice guide. Learn the ropes in a sample plan, step by step, with a little confetti at the end.
  • A simpler Start free page. Fewer fields, and you are planning in under a minute.
  • Inspector tray for everyone. Details open in a tray along the bottom, and a swipe puts it away.

  • Plan History, clearer. History reads at a glance, and you can turn on weekly snapshots for any plan.
  • Export in three tabs. Gantt, Timeline and Plan pack each get their own tab, with colour and label cards on every page and clean gridlines.
  • Inspector tray. Prefer the Inspector at the bottom? Turn it on in Settings › Display, and swipe it away when you are done.
  • Vera beside the plan. Your planning copilot opens next to the Gantt, offers ready-made asks and can add tasks and milestones. Paid plans.
  • Undo and Redo in Actions and Notes. The same rules as the Gantt.
  • Pinned tasks you can see. A start bracket at every zoom, a small pin by Start, and one click to unpin.
  • Portfolio when you want it. The menu at the top right of Home shows or hides the Portfolio.
  • Promises hold. A customer promise is never pulled earlier just because work finished early.
  • Tap to select, tap to edit. The Gantt list picks a row on the first tap and edits on the second, with a View only lock when you just want to look.
  • Quicker status updates. In progress comes first, with 25, 50 and 75% chips one tap away.
  • A satisfying click. Buttons and switches now have a crisp, tactile feel.
  • Rising Timeline layout. A new way to see your plan climb toward the finish, and By phase works properly again.
  • Actions starts on Home. See the next two weeks of your to-dos the moment it opens.
  • Load a backup yourself. Restore a Takt backup with steady progress all the way.
  • Smoother all round. Links open on the first click, nothing jumps in the Inspector, right-drag panning keeps going, Help is shorter, and a stack of iPad fixes.

  • Plan pack export. Export several plans at once, each with its own crop and revision.
  • Smoother Gantt. Moving, zooming and column fitting are faster and steadier.
  • Drag preview. A ghost of the bar shows exactly where it will land.
  • Takt on iPhone. Actions and Notes, built for the phone.
  • Timeline upgrades. Lanes by default, Gantt colors, a today line and cleaner exports.
  • Bars window. One place to shape how bars and labels look. Automatic follows the zoom, or pick Sparse, Detailed or Custom.
  • Cleaner Export window. A critical path switch, row lines, title placement and easier cropping.
  • Simpler sign-in. Fewer steps the first time, and smooth on iPad.
  • Little moments of delight. A few playful touches as you get work done.
  • Rock-solid link lines. Lines between tasks stay attached while you drag, scroll and zoom.
  • Cleaner Gantt view. A Gridlines switch for a clean view, and a teal line for today.
  • Restore deleted items. Deleted something by mistake? Bring it back yourself.
  • One-step import. One picker for an Excel or CSV sheet, an MS Project XML file or a Takt backup.
  • Better on iPad. Big plans with 500+ rows scroll and zoom smoothly, and you can paste rows straight into the table.
  • Guided first-time tour. It starts on your first empty plan, and you can take it again from the help panel.
  • Live demo. Try Takt right in your browser from the home page, no sign-up needed.
  • Open for sign-ups. Anyone can start free at my.takt-labs.com. Every feature for 90 days, no card.

  • All-new look. The new Takt brand across the app, sign-in pages and emails, with a redrawn command bar that lights up the tool you have on.
  • More export formats. MS Project XML and a full CSV sit right in the Export window, and the PDF now leads with the finish date and adds a legend.
  • Complete critical path. It now fills in from the first task all the way to the last.
  • Bug reports with screenshots and video. Attach a screenshot, mark it up, or record your screen. On iPad, upload a screenshot or recording instead.
  • Upgraded Help. Every keyboard shortcut in one window, tidier Help cards and new try-it examples.
  • Optimized zoom for big plans. The rows you can see draw first and the rest follow a moment later.

  • Custom bar styles. Pick a color and fill for each kind of bar, with a live example as you choose.
  • Holidays on the chart. Every holiday is named in the Gantt header, days off show as a soft tint inside a bar, and a switch turns the shading off.
  • Settings that follow you. Zoom, columns, theme and the rest now travel with you from computer to iPad.
  • Optimized scrolling. No more runaway scrolling into the past, and no jump when you zoom.
  • Consistent design throughout. Right-click menus match the Inspector, dates read the same everywhere, and new type to match the brand.

  • Blank rows. Add breathing room between groups of tasks. They carry through import and export.
  • Faster table entry. Open an existing project's rows in table entry, with Indent and Outdent buttons.
  • Smarter start view. The Gantt opens on the tasks still running, not on last month.
  • Seamless updates. A page left open through an update offers a one-click reload.

  • Read-only share links. Send a read-only view of one project's Gantt or Timeline. No account needed to look.
  • Smart emails. A weekly brief, a daily summary of changes and a heads-up when something runs late. Choose which in Settings › Email.
  • MS Project import. Bring in an XML file as a new project, with a report of exactly what came across.
  • Commitment tracking. Commitment rows say LATE when the plan misses the date you promised.
  • Redesigned Inspector. Schedule first, waits in one list, and sections that fold away.

  • Expanded color palette. A bigger palette, with a dot on the colors already in use.
  • Portfolio quick view. One click on a lane shows the key facts; double-click opens its Gantt.
  • Print-ready exports. Bigger text, month lines, holidays and row lines so a printed plan reads easily.